Home  > Info Center  > FAQ  >  How long does it take to set up the floating water park on water?

How long does it take to set up the floating water park on water?

2018-04-11

The set up time depends on the number and size of the products as well as the number of set up labors. For example, if the anchors are in place, a 100 capacity park takes 1-2 days for 6 persons.


Chat Online 编辑模式下无法使用
Chat Online inputting...